Penetration through the vapor barrier TOPWET to connect TWOP and TWP to the vapor barrier with an integrated sleeve of a modified bitumen strip. Depth under insulation 200 mm, option of extension up to 1000 mm on request. This product can not be used as a penetration element for the lower structure.
Dimension | ||
---|---|---|
TWOD 50 BIT | DN 50 |
Drawing documentation |
TWOD 75 BIT | DN 70 |
Drawing documentation |
TWOD 110 BIT | DN 100 |
Drawing documentation |
TWOD 125 BIT | DN 125 |
Drawing documentation |